Perot Museum of Nature & Science

Dallas’ Perot Museum of Nature and Science sets a high bar for a new generation of museums. This uniquely designed 180,000-square-foot steel cube floats over a landscaped base in the center of Dallas. KPost Company worked hand-in-hand with the owner, architects, and subcontractors to resolve the ever-changing details of this complex museum. Originally contracted to complete the roofing and roof-related sheet metal on the building’s upper penthouses, built-up air handler unit, office terrace, main roof and third-level roof, during construction KPost Company’s scope was expanded to include the entry plaza and rear entrance.

Perot Museum of Nature and Science

AT&T Stadium

As the largest and most extravagant football and multi-purpose stadium in the United States, AT&T Stadium in Arlington, Texas has a capacity of more than 100,000 for events such as the Super Bowl, the NBA All Star Game, and the NCAA Final Four. KPost Company will always be proud to have been selected to install the fixed membrane roof system over AT&T Stadium. The steep slope of the roof presented potentially hazardous working conditions. KPost Company’s unwavering commitment to SAFETY best practices ensured a successful installation without a single worker lost to injury due to a fall.

AT&T Stadium

Omni Dallas Hotel

The opening of the landmark Omni Dallas Convention Center Hotel was one of the city’s most-anticipated highlights of 2012. KPost Company’s participation in the project went beyond just 20+ unique roof assemblies to also include specialty installations of the outdoor patio and pool deck surfaces. The finished project earned several industry awards and recognitions for KPost Company including a Gold Circle Award from the National Roofing Contractors Association (NRCA).

Omni Hotel

Hunt Headquarters

Already considered an architectural icon at the edge of the Arts District in downtown Dallas, the Hunt Oil Company headquarters embodies all to be expected in a best-in-class corporate office facility. Besides the roof system installation, KPost Company was also responsible for sealing and coating the exterior water feature that prominently wraps around the base of the building. The expertise of KPost Company’s waterproofing group is evident in a building amenity that is visible to all and enjoyed daily by many!

Hunt Headquarters

National Medal of Honor Museum

The National Medal of Honor Museum in Arlington is a project where the building envelope has to perform for decades—there’s no room for leaks or shortcuts. Designed by Rafael Viñoly Architects, the structure’s geometry and exposed elements demanded careful coordination from the earliest phases. Working with SOPREMA’s integrated system, KPost Company installed the roofing and waterproofing assembly using multi-ply membranes, moisture-cured adhesives, conductive primers, and PMMA liquid-applied technology at critical transitions, helping protect the collections and immersive exhibits inside while keeping the architecture true to the design intent.

company icon

Frequently Asked Questions

Scale changes the engineering and the calendar changes everything else. Very large roof areas need drainage and expansion capacity that smaller buildings never require, and the structures move enough that details have to accommodate it. The harder constraint is usually access: a venue with a fixed event schedule gives you defined windows to be on the roof and no flexibility when weather takes one away. Sequencing and the ability to close in work quickly matter more than raw crew size.

Because what is underneath cannot get wet and cannot tolerate humidity swings. Collection storage and gallery spaces are climate controlled to tight tolerances, which puts more weight on the vapor and air control layers than on a typical commercial building, and it makes any leak a conservation problem rather than a maintenance one. Architecturally ambitious museum buildings also tend to have complex geometry, which multiplies the number of transitions and penetrations that have to be detailed individually.

It means work was added after the original contract, which on a complex building is normal rather than a sign of trouble. Conditions get discovered, designs get resolved late, and adjacent scopes turn out to need a single responsible party. The Perot Museum project began as roofing and roof related sheet metal and grew to include the entry plaza and rear entrance. What makes expansion work well is that responsibility for the waterproofing stays with one contractor across the transitions.

It means the roofing contractor is brought in during design rather than after drawings are complete, to review details, flag conflicts between trades, and advise on sequencing and materials. On an unusual building this is where most of the value is created, because a transition that cannot be built is far cheaper to fix on paper. It also sets realistic expectations about schedule before those become contractual.

They tell you about capability and about detailing discipline, which transfer. They do not tell you about responsiveness on a small job, which is a different question worth asking directly. The most useful thing to take from a project list is whether it contains buildings that resemble yours in system type and complexity rather than in fame. Our commercial roofing page covers how projects of any size are scoped.