Key Takeaways

  • ES-1 is a wind test for the roof edge. ANSI/SPRI/FM 4435/ES-1 measures how much load the coping or edge metal on a low-slope roof can take before it lets go. The current edition was approved in November 2022.
  • The building code requires it. Section 1504.6 of the 2021 International Building Code calls for metal edge systems on low-slope membrane roofs to be tested under Test Methods RE-1, RE-2 and RE-3. Dallas and Fort Worth both adopt that code with local amendments.
  • A passing result belongs to one assembly from one shop. The profile, the metal thickness, the cleat and the fasteners are tested together. Under SPRI’s guidance, a thinner gauge or a larger profile is no longer the tested product. Neither is the same shape made by a different fabricator.
  • Gutters and counterflashing fall outside ES-1. The code excepts both. External gutters have their own test standard, ANSI/SPRI GT-1, and most of the other sheet metal on a commercial building is custom to that building.
  • KPost fabricates the edge and the rest of the metal in house. Our Dallas shop is ANSI/SPRI ES-1 compliant and forms edge metal and coping along with gutters, downspouts, equipment curbs and custom copper. Metal roofing panels are formed on site, and KPost crews handle specialized panels as long as 200 feet.

ANSI/SPRI ES-1 is the wind test standard for the metal at the edge of a low-slope commercial roof. It measures how much wind load a coping or a run of edge metal can resist before it comes loose, and the International Building Code requires that testing on low-slope membrane roofs. If you write or review commercial roof specifications in Dallas Fort Worth, you have seen it called out.

The edge gets its own standard for a reason. SPRI’s design standard for roof edges cites a study of 145 FM Global losses on built-up roofs, and in 85 of them, 59 percent, the loss happened because the roof perimeter failed.

This post covers what ES-1 tests and what the code asks for, then where a compliant edge goes wrong between the submittal and the roof. The second half turns to the rest of the sheet metal on a commercial building, and to what KPost fabricates in its own shop.

What is ANSI/SPRI ES-1?

ANSI/SPRI ES-1 is a laboratory test standard for the edge systems on low-slope roofs, which it defines as a slope of 2:12 or less. Its full designation is ANSI/SPRI/FM 4435/ES-1, Test Standard for Edge Systems Used with Low Slope Roofing Systems. It comes from SPRI, the association that represents sheet membrane and component suppliers to the commercial roofing industry. The current edition was approved in November 2022.

The standard dates to 1998, and testing to it has been an International Building Code requirement since the 2003 edition. In 2011 it was brought into line with FM 4435, the method FM Approvals uses to evaluate perimeter flashing. That is where the longer name comes from.

A few of the standard’s terms are worth pinning down, because they decide which test applies:

  • Edge system: the component or set of components at the roof perimeter that flashes and secures the roof membrane.
  • Coping: the cap on top of a parapet wall, usually metal, sloped to carry off water.
  • Fascia: the vertical or steeply sloped trim at the perimeter of a building, typically the border of the low-slope roof.
  • Gravel stop: a flanged edge piece, usually metal, that keeps loose aggregate on the roof and gives the membrane a continuous edge.
  • Cleat: a continuous metal strip, or an angled piece, used to secure the metal components.

ES-1 is a test standard and nothing more. The wind load itself comes from the building code, and edge design has a companion document of its own, ANSI/SPRI ED-1, published in 2019.

Does shop-fabricated edge metal have to be ES-1 tested?

Yes. The code makes no distinction between a manufactured product and metal formed in a contractor’s shop. Under SPRI’s guidance, edge metal can come from a manufacturer of pre-engineered products that has tested them, or from a local fabricator that has had its own products tested. A third route was built with contractors in mind, and it runs through NRCA.

NRCA tested the coping and fascia shapes that roofing contractors typically fabricate, with UL in 2015 and with Intertek in 2018, and it maintains certification programs with both. A contractor’s shop can join as an authorized fabricator. Those fabricators receive detailed fabrication information and are audited by NRCA’s testing agency. SPRI is direct about the shortcut: copying the NRCA shapes without being in the program does not produce an ES-1 tested product.

KPost’s sheet metal fabrication shop in Dallas is ANSI/SPRI ES-1 compliant, and its edge metal and coping are built to that test. KPost Company is listed in NRCA’s directory of authorized fabricators under the Intertek program, for ES-1 edge metal and for GT-1 gutters.

For any supplier, SPRI’s advice on verification is short. Ask the fabricator for a copy of the test report or an ES-1 certificate, and if the fabricator works under NRCA’s program, confirm the listing on NRCA’s website.

Where does a tested roof edge go wrong in the field?

It goes wrong when the metal on the roof is no longer the assembly that passed the test. An ES-1 result covers a complete assembly. Professional Roofing, NRCA’s magazine, has put the rule plainly: a tested product has to be made exactly as it was tested, including material types and thicknesses, fasteners, fastener locations and installation method. The gaps tend to look like this:

  • Wider cleat or fastener spacing than the test used. The submittal shows a tested profile, then the crew installs it on a spacing the test never covered. A light gauge can pass with its cleat fastened at close intervals and fall short when the spacing opens up.
  • Thinner metal or a larger profile. SPRI’s guidance lets one test cover another product only when it is the same design in the same material from the same fabricator, at an equal or heavier gauge and an equal or smaller size.
  • A tested part paired with an untested one. A tested cleat under an untested cover is not a tested system, because fascia and coping systems are tested as complete assemblies.
  • A nailer that cannot carry the load. The edge system relies on the wood blocking beneath it. ANSI/SPRI ED-1 calls for wood nailers at least 1.5 inches thick, designed for the same outward and upward loads as the metal. On reroofing work, deteriorated nailers are common and should be replaced.
  • Corners treated like the rest of the perimeter. Wind forces are more intense near building corners, so the design load there is higher than along the straight runs.
  • Equipment fastened to the coping. ED-1 says attachments such as lightning rods and signs should stay off the roof edge system or be isolated from it, since they can break the water seal and put wind load into the edge.

That last one can happen long after the roofer has left, which is one reason the roof edge belongs on a commercial roof maintenance checklist.

What should an ES-1 specification and submittal include?

A specification should state the wind loads the roof edge has to resist and require tested resistance that meets them. A submittal should show that the metal being supplied is the assembly that was tested. A line that only says edge metal shall comply with ES-1 leaves both of those open. The pieces worth asking for:

  • The design wind loads for the roof edge, with corner zones identified. Section 1603 of the IBC already requires design loads on the construction documents.
  • The test method for each edge condition: RE-3 for copings and RE-2 for fascia and gravel stops. RE-1 is added where the edge holds the membrane.
  • Tested resistance equal to or greater than the design load, after the safety factor the designer selects.
  • A test report or certificate that names the fabricator and the tested profile, with its metal and thickness.
  • Shop drawings that show the cleat and the fastener spacing as tested, plus how the nailer is attached.

A sentence along these lines covers the core of it: “Roof edge systems shall be tested in accordance with ANSI/SPRI/FM 4435/ES-1, Test Methods RE-1, RE-2 and RE-3 as applicable, with tested resistance equal to or greater than the design wind loads indicated on the drawings.” That wording follows the code section and the two steps above. The loads and the final language belong to the design professional on the project.

Does ES-1 apply to gutters and counterflashing?

No. The code section that requires ES-1 testing excepts both. Gutters have a standard of their own, ANSI/SPRI GT-1, and Section 1504.6.1 of the 2021 IBC requires gutters that are used to secure the edge of the roof membrane to be tested under its G-1 and G-2 methods.

GT-1 is a laboratory test for external gutters. G-1 loads the gutter face outward and G-2 loads the gutter upward, the two directions wind works on it. A third method, G-3, loads the gutter downward the way water and ice do, and the code does not call for it. The standard does not rate how much water a gutter carries, and downspouts are outside its scope.

Counterflashing is the metal secured to a wall or curb that laps over the upper edge of the roof flashing below it. The edge rule does not reach it, or most of the other sheet metal on a building: the scuppers that let water out through a parapet wall, the curbs under rooftop equipment, the pipe flashings, the ornamental work, the wall panels and cladding. Much of that metal has no single pass or fail test behind it. How it performs depends on how it is formed and installed, which makes the shop behind it part of the specification.

What does KPost’s in-house sheet metal shop fabricate?

KPost’s sheet metal shop sits on its Dallas campus. It is ANSI/SPRI ES-1 compliant, and the company also fabricates at the job site, so the people installing the metal are the ones who measured and formed it. The shop’s work covers the tested roof edge and most of the metal around it:

  • Edge metal and coping fabricated to ANSI/SPRI ES-1
  • Gutters and downspouts with their accessories
  • Equipment curbs for rooftop HVAC units
  • Ornamental sheet metal and custom architectural components

Some pieces are better made on site, and KPost forms those at the project:

  • Metal roofing panels, including specialized panels as long as 200 feet
  • Custom saddles and scuppers
  • Miters, the angled corner pieces for coping and edge metal

Field forming earns its place on older buildings. Walls there are seldom square, and some pieces cannot be sized until they are measured in place.

Then there is the metal people see. Architectural sheet metal takes in cornices, domes, cupolas and finials along with copings and fascia. Restoration work often means reproducing those pieces from whatever survives of the originals. On the Davis Building renovation, KPost rebuilt the copper cupola and replaced the copper copings. At Grapevine Station, the custom copper components included an 18 inch fascia and internal gutters.

The same shop produces architectural metal panels and cladding for interior and exterior walls, along with the closures and trims a panel system needs. On the roof side, KPost’s projects include the Charles Schwab corporate headquarters, with custom designed Bemo roof panels spanning more than 120 feet.

Keeping the work in house protects the schedule and the fit. A change in the field goes back to our own shop and not into another company’s order queue. The installation is done by specialized sheet metal crews whose members typically have 8 to more than 20 years in the trade. KPost takes the same approach to roof decks and self-performs lightweight insulating concrete.

Frequently asked questions

ES-1 is the test and ED-1 is the design standard. ANSI/SPRI/FM 4435/ES-1 describes how to load an edge system in a laboratory and what counts as failure. ANSI/SPRI ED-1, Design Standard for Edge Systems Used with Low Slope Roofing Systems, covers what the test leaves out, starting with wind load design for the roof edge, including gutters and nailers. It also addresses metal thickness for flatness and how to accommodate thermal movement and limit corrosion. The building code cites the ES-1 test methods. ED-1 was approved in 2019, and SPRI had a revision in draft at the time of writing.

No, though the two share test methods. FM 4435 is the method FM Approvals uses to test and evaluate metal edge flashings, and ES-1 has been aligned with it since 2011. An FM Approval goes further than a test result. FM reports a classification such as 1-60 or 1-90 that includes a safety factor, and the approval comes with manufacturing quality audits. SPRI also notes that meeting FM Global’s Loss Prevention Data Sheet 1-49 does not make an edge ES-1 tested. Data Sheet 1-49 applies to buildings insured by FM, so if yours is one, ask the insurer what it expects at the perimeter.

No. ES-1 tests an assembly at whatever thickness the fabricator builds it, and the tested thickness then becomes part of what has to be installed. Minimum thickness appears in the design standard. ANSI/SPRI ED-1 includes a table of minimum thicknesses for flatness that steps up with the size of the exposed face. For coated steel it lists 24 gauge on exposed faces up to 8 inches and 22 gauge up to 10 inches. Larger faces, up to 24 inches, call for 20 gauge. Those minimums are about keeping the metal flat. ED-1’s commentary adds that the RE-2 and RE-3 tests may show thicker metal is needed for higher wind loads.

New edge metal generally does. The reroofing section of the IBC says the materials and methods used to recover or replace an existing roof covering have to comply with Chapter 15, and the edge metal rule sits in Chapter 15. That is one way code-required work ends up in the cost of a commercial roof replacement. Replacement often changes the edge anyway. Added insulation makes the roof thicker, which changes the dimensions of the edge metal and coping, and KPost’s shop forms the taller edge and coping profiles that a thicker roof calls for. Whether existing metal can stay is a question for the local building official.

Yes, in part. RE-1 checks whether the edge can hold a membrane that depends on it, which is the case on ballasted and mechanically attached roofs. A fully adhered membrane does not rely on the edge that way, so RE-1 is not needed. The metal itself still has to resist the wind. SPRI’s guidance is that all perimeter edge metal on a low-slope roof needs to be tested under RE-2 or RE-3, whatever the roof system.

Bring the metal into the project early

Edge metal is easy to leave until the end, after the roof system is chosen and the drawings are nearly done. That is when a tested assembly gets swapped for something that only looks similar. The better sequence is to put the wind loads and the tested profiles on the table while the details can still move, with the people who will form the metal in the room.

KPost Company fabricates and installs sheet metal alongside its commercial roofing work across Dallas Fort Worth, from tested coping to custom copper. If your project has a roof edge to specify or metal that is out of the ordinary, contact our team. The earlier we see it, the more room there is to detail it properly.

Code sections and test requirements cited here are drawn from the 2021 International Building Code, ANSI/SPRI/FM 4435/ES-1, ANSI/SPRI ED-1, ANSI/SPRI GT-1 and published SPRI and NRCA guidance, current as of October 2026. Codes and standards are revised, and local amendments apply. Design wind loads and edge details for a specific building are set by the design professionals on that project, and the approved submittal governs.

Here is a look at the shop and field work behind KPost sheet metal:

company icon